Home / Sizes / 30-Yard
30-Yard Dumpster Rental in Gonzales, LA $649 for 7 Days
The big box, priced in the open. Some rental companies leave the 30-yard off their price list entirely. Ours is right here: $649 for 7 days with 3 tons included, delivery and pickup in.
Delivery and pickup included in every price. Overage is $65 per ton. Weekly extension is $150 flat.

Dimensions and capacity
| Footprint | About 22 ft long by 8 ft wide |
|---|---|
| Wall height | About 6 ft tall |
| Capacity | 30 cubic yards, about 9 to 10 pickup truck loads |
| Weight included | 3 tons in every rental period |
| Door | Walk in rear door for equipment and bulky demo debris |
Why do some companies hide this price? The 30-yard carries the most variables of any size: longer trucks and tighter turns, more tons per load, higher dump fees on heavy construction debris, and more jobs that run long or need swaps. Those variables are real, and they are exactly why the price, the included tons, the overage rate, and the extension rate all need to be in writing before the box lands. On this site, they are.
Best for the 30-yard
- New home construction (framing waste, packaging, cutoffs)
- Big additions and whole house gut jobs
- Demolition debris (light demo, not solid concrete)
- Commercial cleanouts and tenant build outs
- Large storm recovery jobs with a crew loading daily
Not the right fit
- Short or narrow driveways (it needs about 22 ft plus truck room)
- Heavy concrete, dirt, or brick as the main load (you will hit weight limits with the box mostly empty, ask for a heavy load plan)
- One room or garage jobs (the 12-yard at $475 or 20-yard at $549 fits better)
- Tight subdivision streets with cars parked both sides (send a photo of the street first)
Weight guidance by material
The 30-yard includes 3 tons, the most of any size. Bulky light debris is what this box was built for.
| Material | How it loads | Watch out |
|---|---|---|
| Framing lumber and cutoffs | Medium weight, high volume. | Ideal load for this size. Cut pieces to sit below the top rail. |
| Packaging and build waste | Very light, very bulky. | Fills the box fast with little weight. Break down boxes flat. |
| Drywall from a full gut | Medium heavy at this volume. | A whole house of drywall can pass 3 tons. Plan a swap. |
| Demo debris, mixed | Varies widely. | Tell us what is coming out of the building before delivery. |
| Concrete, dirt, brick | Extremely heavy. | Never the main load in a 30-yard. Ask about smaller heavy loads instead. |
Over the included tons, extra weight is $65 per ton off the scale weight. Contractors: see swap out and job site notes on the roll-off page.